Labrador Gold Corp. (NKOSF) – High Expectations for 2023


Friday, February 24, 2023

Mark Reichman, Senior Research Analyst, Natural Resources, Noble Capital Markets, Inc.

Refer to the full report for the price target, fundamental analysis, and rating.

Significant progress at Kingsway. Exploration and drilling at the company’s 100%-owned Kingsway gold project is targeting the Appleton Fault over a 12-kilometer strike length. With approximately $17 million in cash, Labrador Gold has ample financial resources to fund the remaining 34,000 meters of drilling of the company’s planned 100,000-meter drill program.

2023 drilling program. Drilling will continue this year at the Big Vein target and further drilling will be undertaken at the Midway and Pristine targets. Labrador Gold currently has two drill rigs deployed at the Big Vein target. The company expects to add a third rig to drill northeast of the Pristine target which could later move to the Midway target, and a fourth rig to drill in an area (“The Gap”) between Big Vein and Pristine.


Get the Full Report

Equity Research is available at no cost to Registered users of Channelchek. Not a Member? Click ‘Join’ to join the Channelchek Community. There is no cost to register, and we never collect credit card information.

This Company Sponsored Research is provided by Noble Capital Markets, Inc., a FINRA and S.E.C. registered broker-dealer (B/D).

*Analyst certification and important disclosures included in the full report. NOTE: investment decisions should not be based upon the content of this research summary. Proper due diligence is required before making any investment decision. 

Coeur Mining (CDE) – No Big Surprises


Friday, February 24, 2023

Mark Reichman, Senior Research Analyst, Natural Resources, Noble Capital Markets, Inc.

Refer to the full report for the price target, fundamental analysis, and rating.

Fourth quarter and full year 2022 financial results. Coeur reported adjusted fourth quarter and full year 2022 losses per share of $(0.06) and $(0.32), respectively, and in line with our estimates. Fourth quarter and full year adjusted EBITDA were $35.9 million and $139.0 million. Full year gold and silver ounces produced were 330.3 thousand and 9.8 million, respectively, while ounces sold were 330.0 thousand and 9.8 million. Free cash flow during the fourth quarter and full year 2022 amounted to $(84.5) million and $(326.7) million due in part to heavy capital expenditures of $113.1 million and $352.4 million, respectively. On balance, financial results were in line with our expectations.

Completion of the Rochester expansion is expected by mid-2023. As of December 31, 2022, approximately $605 million of the $650 million to $670 million project cost has been committed, while $494 million had been incurred.


Get the Full Report

Equity Research is available at no cost to Registered users of Channelchek. Not a Member? Click ‘Join’ to join the Channelchek Community. There is no cost to register, and we never collect credit card information.

This Research is provided by Noble Capital Markets, Inc., a FINRA and S.E.C. registered broker-dealer (B/D).

*Analyst certification and important disclosures included in the full report. NOTE: investment decisions should not be based upon the content of this research summary. Proper due diligence is required before making any investment decision. 

Release – Eskay Mining Encounters 1.51 gpt Au and 25.39 gpt Ag over 43.1m and 2.84 gpt Au and 22.17 gpt Ag over 16.4m in Extensional Drilling at the TV Deposit, Consolidated Eskay Project, Golden Triangle, BC

Research News and Market Data on ESKYF

February 23, 2023

TORONTO, ON / ACCESSWIRE / February 23, 2023 / Eskay Mining Corp. (“Eskay” or the “Company”) (TSXV:ESK) (OTCQX:ESKYF) (Frankfurt:KN7)(WKN:A0YDPM) is pleased to announce further encouraging diamond drill results from its 2022 exploration program at its 100% controlled Consolidated Eskay Property in the Golden Triangle, British Columbia.

“Results from our 2022 exploration season demonstrate Eskay’s team has made considerable progress toward unraveling the district-scale potential of VMS mineralization surrounding the Eskay Creek deposit,” commented Dr. John DeDecker, VP of Exploration for Eskay Mining Corp. “Achievements of the 2022 exploration program include defining a new trend of VMS mineralization along the Scarlet-Tarn corridor parallel to and approximately seven kilometers east of the Eskay anticline. Tarn Lake and Scarlet Knob are situated along an east-west trending VMS feeder structure hosted by Eskay rhyolite like that seen in the footwall of the Eskay Creek deposit. Mapping and prospecting define a westward stratigraphic younging direction suggesting that stockwork and replacement-style mineralization at Tarn Lake may represent feeders to seafloor-hosted mineralization up-section towards the important Contact Mudstone horizon, host to high-grade mineralization at Eskay Creek. This recognition is a significant step towards meeting our goal of discovering new Eskay Creek-like high-grade VMS systems. Drilling at TV now shows that Au- and Ag-bearing massive sulfide extends 100 m along strike and overlies an even more extensive zone of stockwork mineralization. We are eager to follow up on all of these encouraging results in 2023.”

TV Extensional Drilling

Highlight results:

  • 4.61 gpt Au and 22.17 gpt Ag (4.89 gpt Au Eq) over 6.28m within 2.84 gpt Au and 22.17 gpt Ag (3.13 gpt Au Eq) over 16.36m in hole TV22-105
  • 2.66 gpt Au and 30.45 gpt Ag (3.05 gpt Au Eq) over 10.56m within 1.51 gpt Au and 25.39 gpt Ag (1.83 gpt Au Eq) over 43.09m in hole TV22-120
  • 3.36 gpt Au and 109.50 gpt Ag (4.76 gpt Au Eq) over 2.00m within 1.14 gpt Au and 30.40 gpt Ag (1.53 gpt Au Eq) over 30.56m in hole TV22-97
  • 6.88 gpt Au and 21.00 gpt Ag (7.15 gpt Au Eq) over 1.10m within 1.28 gpt Au and 87.92 gpt Ag (2.41 gpt Au Eq) over 14.95m in hole TV22-109

Drilling at TV in 2022 expanded the footprint of both the Upper Massive Sulfide Zone and Stockwork Zone at TV (Figures 1, 2 and 3). Massive sulfide mineralization now extends approximately 100 m along strike, ranges from 5 to 10 m in thickness, and is characterized by sulfide lenses hosted by intensely silicified carbonaceous mudstone associated with peperitic dacite (Figures 4 and 5). Massive and semi-massive sulfide mineralization overlies an extensive stockwork feeder zone hosted by dacitic and andesitic breccia and peperite. Stockwork mineralization now extends approximately 175 m along strike, 175 m down dip, and ranges in thickness from 50 to 100 m. Significantly, drill holes testing the up-dip extent of the stockwork zone (TV22-106, 108, and 112) intercepted strongly anomalous Au and Ag values with interspersed values over 1 gpt Au equivalent. Rock chip samples collected from the vicinity of these drill holes suggest that this up-dip zone may contain higher grade pockets of Au and Ag mineralization (Figure 2).

Significant mineralized intervals from 2022 drill holes completed in the vicinity of the TV deposit are presented in the table below. A complete list of the coordinates of drill holes including holes without significant mineralized intercepts is found at the bottom of this release.

HoleFrom (m)To (m)Length (m)Au (gpt)Ag (gpt)Au Eq (gpt)Ag Eq (gpt)
TV22-88133.30135.001.701.221.221.2496.38
TV22-9795.44126.0030.561.1430.401.53119.68
includes114.00116.002.003.36109.504.76371.58
TV22-9988.7293.604.880.7023.501.0078.17
97.64103.345.701.7719.462.02157.82
includes102.55103.340.798.8523.009.14713.30
TV22-10586.72103.0816.362.8422.173.13243.78
includes86.7293.006.284.6122.174.89381.59
and96.00101.005.002.3925.402.71211.66
TV22-1062.564.602.041.692.381.72134.20
24.9126.912.000.7817.501.0078.30
TV22-1084.206.992.791.946.002.02157.32
15.0018.003.001.332.171.36105.76
TV22-10950.0565.0014.951.2887.922.41188.00
includes50.0551.151.106.8821.007.15557.64
and57.5863.235.651.03173.123.25253.38
TV22-11072.2788.9516.681.4419.621.69131.55
TV22-11151.5658.787.220.4592.991.64127.96
includes54.8356.511.680.87309.004.84377.21
TV22-1120.007.007.000.759.310.8768.05
includes4.005.001.003.578.183.67286.64
TV22-120127.79170.8843.091.5125.391.83142.83
includes130.18131.000.824.1915.004.38341.82
and136.58147.1410.562.6630.453.05238.18
TV22-12195.0097.182.180.13121.871.69131.82
128.31132.003.691.2740.311.79139.37

Au Eq and Ag Eq values have all been adjusted to the silver-to-gold ratio of 78:1 for this news release.

Tarn Lake

Assay results from the maiden drill program at Tarn Lake have already defined an 80m-long open-ended trend of Au mineralization that dips west-northwest (Figures. 1, 7 and 8). Rock chip sample results suggest that Au mineralization extends up-dip from the drill holes to the surface. Mineralization remains open down-dip.

Sulfide mineralization intercepted by drilling is dominantly replacement-style and stockwork-style (Figure 9), and is hosted by intensely altered Eskay rhyolite. This style of mineralization and intense hydrothermal alteration are consistent with a position in the immediate sub-seafloor environment of a VMS feeder zone. Geological mapping, drilling, and lithological facies analyses show extensive rhyolite-bearing volcaniclastic debris flow beds, peperitic rhyolite, and flow-banded rhyolite defining a rhyolite dome complex that formed at a paleoseafloor position proximal to a syn-volcanic VMS feeder structure, supporting the interpretation based on mineralization and alteration. Based on this geology, Eskay’s exploration team thinks there is considerable potential for the presence of seafloor-hosted VMS mineralization at one or more horizons at Tarn Lake, as is seen along the parallel Eskay Creek-Sib-Lulu trend to the west (Figure 10).

Eskay’s geological mapping team has determined that the stratigraphic younging direction along the Scarlet-Tarn trend is to the west, and that the contact between the Eskay rhyolite and the Willow Ridge basalt lies to the west of Tarn Lake (Figure 10). The contact between these lithologies defines the Contact mudstone horizon that hosts the world-class Au-Ag mineralization at Eskay Creek Mine. Given that recent rock chip sampling indicates Au mineralization continues west of Tarn Lake, it is possible the Tarn VMS system continues up-stratigraphy to the Contact mudstone horizon. These findings are a significant step towards our goal of finding Eskay Creek-like VMS deposits on the Consolidated Eskay Property.

In addition to the potential for Au and Ag mineralization down-dip and up-section from 2022 drilling, there is considerable potential for mineralization to extend beneath Bruce Glacier to Scarlet Knob along east-west trending feeder structures (Figure 11). These feeder structures are delineated by andesite dikes surrounded by sulfide mineralization and intense hydrothermal alteration of the host Eskay rhyolite.

Significant drill results from hole TN22-8 completed at Tarn Lake are presented in the table below.

HoleFrom (m)To (m)Length (m)Au (gpt)Ag (gpt)Au Eq (gpt)Ag Eq (gpt)
TN22-890.1992.882.690.7529.001.1287.50
117.33123.005.671.373.371.41110.00
133.53139.726.191.462.131.49116.16
158.04161.002.961.274.111.32102.78

Au Eq and Ag Eq values have all been adjusted to the silver-to-gold ratio of 78:1 for this news release.

2022 Exploration Program

The fundamental goal of the 2022 exploration program was to identify new precious metal-rich VMS deposits across the Consolidated Eskay Project through early-stage work including mapping and geochemical sampling, and more advanced work including widely spaced drilling. During the 2022 exploration season, Eskay Mining successfully completed 29,500m of diamond drilling along the TV-Jeff corridor and along the Scarlet Ridge-Tarn Lake trend.

Drill results discussed in this news release come from holes drilled in the vicinity of the TV deposit and the newly discovered Tarn Lake mineralizing system. As of this news release, all assays have returned from the 2022 drill program.

Au Eq and Ag Eq Calculations and True Width:

Note on use of Au eq (Au eq=Au+Ag/78) and Ag eq (Ag eq=Au*78+Ag): Mineralization at the TV and Jeff deposits displays similar characteristics and mineralogy to the Eskay Creek deposit and therefore for Au eq, and Au:Ag, a ratio of 78:1 is used and Au eq and Ag eq values are deemed to be reasonable based on assumed gold recovery (84.2%) and silver recovery (87.3%) as reported in the Eskay Creek Project NI 43-101 Technical Report and Prefeasibility Study, British Columbia, Canada, Effective Date: 22 July, 2021, Prepared for: Skeena Resources Ltd., Prepared by: Absence Engineering Canada Inc.

True widths of reported intercepts are not fully understood at this time but given the moderately dipping tabular nature of these deposits and the steep angle of drilling, Eskay geologists estimate true widths represent approximately 70-90% of the reported drill intercept lengths.

QA/QC, Methodology Statement:

Halved HQ drill core samples are submitted to ALS Geochemistry in Terrace, British Columbia for preparation and analysis. ALS is accredited to the ISO/IEC 17025 standard for gold assays. All analytical methods include quality control standards inserted at set frequencies. The entire sample interval is crushed and homogenized, 250 g of the homogenized sample is pulped. All samples were analyzed for gold, silver, mercury, and a suite of 48 major and trace elements. Analysis for gold is by fire assay fusion followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) on 30 g of pulp. Analysis for silver is by fire assay and gravimetric analysis on 30 g of pulp. Mercury is analyzed using the trace Hg Inductively Coupled Plasma Mass Spectroscopy (ICP-MS) method. All other major and trace elements are analyzed by four-acid digestion followed by ICP-MS.

Historical rock chip sample data is sourced from Assessment Report AR19675 by Granges dated February 7, 1990. Eskay Mining is unable to fully verify this data, and it should be treated as such by the reader.

Dr. Quinton Hennigh, P. Geo., a Director of the Company and its technical adviser, a qualified person as defined by National Instrument 43-101, has reviewed and approved the technical contents of this news release.

About Eskay Mining Corp:

Eskay Mining Corp (TSX-V:ESK) is a TSX Venture Exchange listed company, headquartered in Toronto, Ontario. Eskay is an exploration company focused on the exploration and development of precious and base metals along the Eskay rift in a highly prolific region of northwest British Columbia known as the “Golden Triangle,” 70km northwest of Stewart, BC. The Company currently holds mineral tenures in this area comprised of 177 claims (52,600 hectares).

All material information on the Company may be found on its website at www.eskaymining.com and on SEDAR at www.sedar.com.

For further information, please contact:

Mac BalkamT: 416 907 4020
President & Chief Executive OfficerE: Mac@eskaymining.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements: This Press Release contains forward-looking statements that involve risks and uncertainties, which may cause actual results to differ materially from the statements made. When used in this document, the words “may”, “would”, “could”, “will”, “intend”, “plan”, “anticipate”, “believe”, “estimate”, “expect” and similar expressions are intended to identify forward-looking statements. Such statements reflect our current views with respect to future events and are subject to risks and uncertainties. Many factors could cause our actual results to differ materially from the statements made, including those factors discussed in filings made by us with the Canadian securities regulatory authorities. Should one or more of these risks and uncertainties, such as actual results of current exploration programs, the general risks associated with the mining industry, the price of gold and other metals, currency and interest rate fluctuations, increased competition and general economic and market factors, occur or should assumptions underlying the forward looking statements prove incorrect, actual results may vary materially from those described herein as intended, planned, anticipated, or expected. We do not intend and do not assume any obligation to update these forward-looking statements, except as required by law. Shareholders are cautioned not to put undue reliance on such forward-looking statements.

SOURCE: Eskay Mining Corp.

View source version on accesswire.com:
https://www.accesswire.com/740461/Eskay-Mining-Encounters-151-gpt-Au-and-2539-gpt-Ag-over-431m-and-284-gpt-Au-and-2217-gpt-Ag-over-164m-in-Extensional-Drilling-at-the-TV-Deposit-Consolidated-Eskay-Project-Golden-Triangle-BC

Release – Defense Metals starts construction of Hydrometallurgical Pilot Plant with commissioning at SGS Lakefield scheduled for March 2023

Research News and Market Data on DFMTF

Feb 22, 2023, 09:00 ET

VANCOUVER, BC, Feb. 22, 2023 /PRNewswire/ – Defense Metals Corp. (“Defense Metals” or the “Company“; (TSXV: DEFN) (OTCQB: DFMTF) (FSE: 35D) is pleased to announce that construction of the hydrometallurgical pilot plant has started and commissioning is scheduled to start in the second half of March. 

Craig Taylor, CEO of Defense Metals, stated:

“We are excited to enter this important milestone of building and running the hydrometallurgical pilot plant, which is scheduled to be commissioned in late March.  Pilot operations will be done in two segments and should be completed by the end of April. A successful pilot plant program will be essential for the completion of the engineering design and economics of the planned pre-feasibility study.”

Following the successful completion of laboratory flotation and acid bake tests from December 2021 to date, Defense Metals is now ready to build a hydrometallurgical pilot plant. It is important to note that the Independent Preliminary Economic Assessment1 was based on a different hydrometallurgy flowsheet, the gangue-leach – caustic-crack process (see the Company’s March 31, 2022 news release).  However, after numerous laboratory tests the Company decided to pursue piloting of the less complex acid bake process, which has, in initial test-work, yielded better recovery rates, is an industry standard, and has the potential for improved economics.

The objective of the pilot plant is to demonstrate at a larger scale, and with continuous operation, the processing of Wicheeda flotation concentrate to produce rare earths using the acid bake flowsheet, to help confirm the quality of the project, and to gather data required for the pre-feasibility study.

The pilot plant will be configured to produce a high-purity rare earth precipitate suitable as feed for a separation plant. Samples produced from the pilot plant will also be shared with potential end-users for product development and qualification.

Methodology

The plant is being built at SGS Lakefield, Ontario and will run in two segments for approximately two weeks. The feed for the plant will total approximately 600 kg of mineral concentrate that was generated from a flotation pilot plant operated on a bulk sample from the Wicheeda deposit.

Qualified Person

The scientific and technical information contained in this news release, as it relates to the Wicheeda Rare-Earth Project, has been reviewed and approved by John Goode, P. Eng., a metallurgical consultant to the Company, and who is a Qualified Person as defined by National Instrument 43-101 and who has provided the technical information relating to metallurgy in this news release. Kristopher J. Raffle, P.Geo. (BC), a director of the Company, is the Qualified Person as defined in National Instrument 43-101 for the information relating to resources in this news release.

About the Wicheeda REE Property

Defense Metals 100% owned, 4,262-hectare (~10,532-acre) Wicheeda REE property is located approximately 80 km northeast of the city of Prince George, British Columbia; population 77,000. The Wicheeda REE Project is readily accessible by all-weather gravel roads and is near infrastructure, including hydro power transmission lines and gas pipelines. The nearby Canadian National Railway and major highways allow easy access to the port facilities at Prince Rupert, the closest major North American port to Asia.

The 2021 Wicheeda REE Project Preliminary Economic Assessment technical report (“PEA”) outlined a robust after-tax net present value (NPV@8%) of $517 million and an 18% IRR[1]. This PEA contemplated an open pit mining operation with a 1.75:1 (waste:mill feed) strip ratio providing a 1.8 Mtpa (“million tonnes per year”) mill throughput producing an average of 25,423 tonnes REO annually over a 16 year mine life. A Phase 1 initial pit strip ratio of 0.63:1 (waste:mill feed) would yield rapid access to higher grade surface mineralization in year 1 and payback of $440 million initial capital within 5 years.

About Defense Metals Corp.

Defense Metals Corp. is a mineral exploration and development company focused on the acquisition, exploration and development of mineral deposits containing metals and elements commonly used in the electric power markets, defense industry, national security sector and in the production of green energy technologies, such as, rare earths magnets used in wind turbines and in permanent magnet motors for electric vehicles. Defense Metals owns 100% of the Wicheeda Rare Earth Element Deposit located near Prince George, British Columbia, Canada. Defense Metals Corp. trades in Canada under the symbol “DEFN” on the TSX Venture Exchange, in the United States, under “DFMTF” on the OTCQB and in Germany on the Frankfurt Exchange under “35D”.

For further information, please contact:

Todd Hanas, Bluesky Corporate Communications Ltd.
Vice President, Investor Relations
Tel: (778) 994 8072
Email: todd@blueskycorp.ca

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Statement Regarding ” Forward-Looking” Information

This news release contains “forward–looking information or statements” within the meaning of applicable securities laws, which may include, without limitation, statements relating to advancing the Wicheeda REE Project, starting and completing the hydrometallurgical pilot plant including anticipated timeline and expected results and outcomes, the Company’s plans for its Wicheeda REE Project, expected results and outcomes, completion of the PFS, the technical, financial and business prospects of the Company, its project and other matters. All statements in this news release, other than statements of historical facts, that address events or developments that the Company expects to occur, are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment in which the Company will operate in the future, including the price of rare earth elements, the anticipated costs and expenditures, the ability to achieve its goals, that general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed and on reasonable terms. Such forward-looking information reflects the Company’s views with respect to future events and is subject to risks, uncertainties and assumptions, including the risks and uncertainties relating to the interpretation of exploration and metallurgical results, risks related to the inherent uncertainty of exploration and development and cost estimates, the potential for unexpected costs and expenses and those other risks filed under the Company’s profile on SEDAR at www.sedar.com. While such estimates and assumptions are considered reasonable by the management of the Company, they are inherently subject to significant business, economic, competitive and regulatory uncertainties and risks. Factors that could cause actual results to differ materially from those in forward looking statements include, but are not limited to, continued availability of capital and financing and general economic, market or business conditions, adverse weather and climate conditions, failure to maintain or obtain all necessary government permits, approvals and authorizations, failure to maintain community acceptance (including First Nations),  risks relating to unanticipated operational difficulties (including failure of equipment or processes to operate in accordance with specifications or expectations, cost escalation, unavailability of personnel, materials and equipment, government action or delays in the receipt of government approvals, industrial disturbances or other job action, and unanticipated events related to health, safety and environmental matters), risks relating to inaccurate geological, metallurgical and engineering assumptions, decrease in the price of rare earth elements, the impact of Covid-19 or other viruses and diseases on the Company’s ability to operate, an inability to predict and counteract the effects of COVID-19 on the business of the Company, including but not limited to, the effects of COVID-19 on the price of commodities, capital market conditions, restriction on labour and international travel and supply chains, loss of key employees, consultants, or directors, increase in costs, delayed results, litigation, and failure of counterparties to perform their contractual obligations. The Company does not undertake to update forward–looking statements or forward–looking information, except as required by law.

__________________________
1 Independent Preliminary Economic Assessment for the Wicheeda Rare Earth Element Project, British Columbia, Canada, dated January 6, 2022, with an effective date of November 7, 2021, and prepared by SRK Consulting (Canada) Inc. is filed under Defense Metals Corp.’s Issuer Profile on SEDAR (www.sedar.com).

SOURCE Defense Metals Corp.

Defense Metals Corp. (DFMTF) – Entering an Important New Phase


Wednesday, February 22, 2023

Defense Metals Corp. is a mineral exploration and development company focused on the acquisition, exploration and development of mineral deposits containing metals and elements commonly used in the electric power market, defense industry, national security sector and in the production of green energy technologies, such as, rare earths magnets used in wind turbines and in permanent magnet motors for electric vehicles. Defense Metals owns 100% of the Wicheeda Rare Earth Element Property located near Prince George, British Columbia, Canada. Defense Metals Corp. trades in Canada under the symbol “DEFN” on the TSX Venture Exchange, in the United States, under “DFMTF” on the OTCQB and in Germany on the Frankfurt Exchange under “35D”.

Mark Reichman, Senior Research Analyst, Natural Resources, Noble Capital Markets, Inc.

Refer to the full report for the price target, fundamental analysis, and rating.

Pilot plant commissioning. Defense Metals has commenced construction of a hydrometallurgical pilot plant which is expected to be commissioned in March. Pilot plant operations will run in two segments and be completed by the end of April. The feed for the plant will total approximately 600 kilograms of mineral concentrate that was processed from a Wicheeda deposit bulk sample.

The proof will be in the precipitate. The pilot plant is being configured to produce a high-purity rare earth precipitate suitable as feed stock for a rare earths element (REE) separation plant. The objective of the pilot plant is to demonstrate, at a larger scale, the processing of Wicheeda flotation concentrate to produce rare earths using the acid bake hydrometallurgy process and to collect data for a preliminary feasibility study which is expected to be completed in the first quarter of 2024. Samples produced from the pilot plant will be shared with potential end-users for product qualification.


Get the Full Report

Equity Research is available at no cost to Registered users of Channelchek. Not a Member? Click ‘Join’ to join the Channelchek Community. There is no cost to register, and we never collect credit card information.

This Company Sponsored Research is provided by Noble Capital Markets, Inc., a FINRA and S.E.C. registered broker-dealer (B/D).

*Analyst certification and important disclosures included in the full report. NOTE: investment decisions should not be based upon the content of this research summary. Proper due diligence is required before making any investment decision. 

Release – Sierra Metals Subsidiary in Peru, Sociedad Minera Corona Reports Q4 And Full-Year 2022 Financial Results

Research News and Market Data on SMT

FEBRUARY 16, 2023

 DownloadPDF Format (opens in new window)

TORONTO–(BUSINESS WIRE)– Sierra Metals Inc. (TSX: SMT) (“Sierra Metals” or “the Company”) announces the filing at the BVL by its subsidiary, Sociedad Minera Corona S.A. (“Corona”) of its unaudited Financial Statements and the Management’s Discussion and Analysis (“MD&A”) for the fourth quarter and full-year 2022.

The Company holds an 81.8% interest in Corona. The unaudited Financial Statements and MD&A can be viewed at:

SMV — Superintendencia del Mercado de Valores — Información Financiera

To search for the Company’s financial statements, enter the following parameters in the empty fields:

Empresa: Sociedad Minera Corona S.A.
Periodo: 2022 and Trimestre IV

Sierra Metals will release its Q4 and full-year 2022 consolidated financial statements on Monday, March 13th, 2023, with an investor conference call on Tuesday, March 14th, 2023.

About Sierra Metals

Sierra Metals Inc. is a diversified Canadian mining company with Green Metal exposure including copper production and base metal production with precious metals byproduct credits, focused on the production and development of its Yauricocha Mine in Peru, and Bolivar and Cusi Mines in Mexico. The Company is focused on increasing production volume and growing mineral resources. The Company has large land packages at all three mines with several prospective regional targets providing longer-term exploration upside and mineral resource growth potential.

The Company’s Common Shares trade on the Toronto Stock Exchange under the symbol “SMT”.

For further information regarding Sierra Metals, please visit www.sierrametals.com or contact:

Continue to Follow, Like and Watch our progress:

Webwww.sierrametals.com | Twittersierrametals | FacebookSierraMetalsInc | LinkedInSierra Metals Inc | Instagramsierrametals

Investor Relations

Sierra Metals Inc.
Tel: +1 (416) 366-7777
Email: info@sierrametals.com

Source: Sierra Metals Inc.

Haynes International (HAYN) – Uniquely Positioned to Benefit from Growing Demand for High-Performance Alloys


Thursday, February 16, 2023

Haynes International, Inc. is a leading developer, manufacturer and marketer of technologically advanced, nickel and cobalt-based high-performance alloys, primarily for use in the aerospace, industrial gas turbine and chemical processing industries.

Mark Reichman, Senior Research Analyst, Natural Resources, Noble Capital Markets, Inc.

Refer to the full report for the price target, fundamental analysis, and rating.

Initiating coverage with an Outperform rating. Haynes International, Inc., headquartered in Kokomo, Indiana, is one of the world’s largest developers, producers, and distributors of advanced high-performance nickel- and cobalt-based alloys. Haynes’ products, which are sold primarily to companies in the aerospace, chemical processing, and industrial gas turbine industries, consist of high-temperature resistant alloy (HTA) and corrosion-resistant alloy (CRA) products.

Track record of innovation. Founded in 1912, Haynes has a track record of pioneering many well-known nickel- and cobalt-based super alloys. In fiscal 2022, 59% of the company’s revenues were from alloys the company invented. Haynes currently has 20 published U.S. patents and applications. Approximately 27% of its product margin dollars were from proprietary alloys that no one else produces due to Haynes’ patent protection and/or processing technology and expertise. Since 2003, Haynes’ technical programs have yielded nine new proprietary alloys.


Get the Full Report

Equity Research is available at no cost to Registered users of Channelchek. Not a Member? Click ‘Join’ to join the Channelchek Community. There is no cost to register, and we never collect credit card information.

This Company Sponsored Research is provided by Noble Capital Markets, Inc., a FINRA and S.E.C. registered broker-dealer (B/D).

*Analyst certification and important disclosures included in the full report. NOTE: investment decisions should not be based upon the content of this research summary. Proper due diligence is required before making any investment decision. 

Release – Defense Metals Variability Flotation Tests Yield High Rare Earth Recoveries to High Grade Concentrates

Research News and Market Data on DFMTF

NEWS PROVIDED BY

Defense Metals Corp. 

Feb 14, 2023, 03:01 ET

VANCOUVER, BC, Feb. 14, 2023 /CNW/ – Defense Metals Corp. (“Defense Metals” or the “Company“) (TSXV: DEFN) (OTCQB: DFMTF) (FSE:35D) announces the completion of flotation tests on variability samples and a master composite (“Master Composite” or “MC”) prepared from drill core obtained from its 100% owned Wicheeda Rare Earth Element (REE) deposit located in British Columbia, Canada.

John Goode, Defense Metals’ metallurgical advisor, stated:

“Flotation tests on variability samples from the dominant lithological unit of the Wicheeda REE deposit gave an average of 81% recovery to a concentrate assaying 45% rare earth oxide.  Wicheeda is one of the few rare earth deposits under development from which a high-grade mineral flotation concentrate can be produced at recovery rates similar to those obtained by current rare earth producers. High-grade concentrates at high recoveries are a critical requirement for positive production economics.  These successful flotation results help to position Defense Metals’ Wicheeda deposit as one of the best in North America.”

Defense Metals completed flotation tests on variability samples that are representative of the three key REE-bearing lithologies in the Wicheeda deposit: 1) the higher-grade dolomite carbonatite (“DC”) which makes up 73% of the deposit, 2) the xenolithic carbonatite (“XE”) that represents 24%; and 3) the syenite (“SYN”). The primary rare earths minerals are monazite, bastnäsite and synchysite/parisite. Figure 1 shows the mine plan as presented in the Independent Preliminary Economic Assessment issued in 20221.

Figure 1. Wicheeda REE Deposit Lithologies During Mine Life

Key Highlights:

  • Table 1 results show that if the flotation plant is fed DC material at an average grade of 3.3% Total Rare Earth Oxide (“TREO”) and is operated to produce a flotation concentrate containing 45% TREO, an average 81% recovery will be observed.  If 50% TREO were targeted, recovery would be expected to be 77%. The DC mineralized material will be essentially the only lithology fed to the flotation plant in the first eight years as shown in Figure 1.

Table 1: Recovery rates at concentrates of specified grades – DC samples

Note to Table 1: DC Comp is a blend of all DC variability samples.
  • If the flotation plant is fed DC material mixed with other lithological types, as planned for later in the mine life, recoveries at different target concentrate grades will be as shown in Table 2.  Of the four blends tested, when producing a 40% TREO flotation concentrate the recovery rate averaged 80% with higher recoveries when the DC content was higher.

Table 2: Recovery rates at concentrates of specified grades – DC blends

Notes to Table 2: DC-XE2 and DC-XE3 are 1:2 and 2:1 blends of DC and XE Comp, respectively.  DC-SYN2 is 2:1 blend of DC Comp and SYN2.  MC is a blend of DC (73.4%), XE (22.5%), and SYN (3.8%).
  • Table 3 shows the testwork results for the variability samples comprising pure XE and SYN lithologies.  The flotation plant is expected to only see such lithologies when they are blended with DC.  However, the data show that if the lower grade XE and SYN material are processed alone, at a target flotation concentrate grade of 40% TREO, the average recovery rate will be 59%.

Table 3: Recovery rates at concentrates of specified grades – SYN and XE samples

Notes to Table 3: SYN Comp and XE Comp are composites of respective variability samples. DC01 was mis-identified as being DC, but assays and mineralogy showed it to be XE and it was treated as such.  N/A indicates insufficient data for meaningful average.

As noted above, in the first 8 years of the mine life, over 90% of the flotation plant feed will be DC material, with higher rare earth grade, with the later years being mostly DC and XE material at relatively lower grades (see Figure 1).

The grade-recovery-concentrate data provided above will support the upcoming preliminary feasibility study (PFS) and allow the development of an updated and enhanced mine plan incorporating drilling completed following the PEA that identifies lithology and feed grades to arrive at estimates of the concentrate and REO production rates in each year.

Methodology and QA/QC

Defense Metals prepared 17 variability samples covering different lithologies, areas of the deposit, and head grades using drill core material. The average mass of each sample was 31 kg, with the Total Rare Earth Oxide (“TREO”) assays  ranging from 1.07% to 4.52% with an average of 2.34% TREO.  Drill core material was also used to make a 260 kg Master Composite sample containing each of the three lithologies in their respective life-of-mine proportions.  The MC sample had a head grade assay of 2.49% TREO.

All variability samples and the MC sample were shipped to SGS, Lakefield, Ontario where they were checked, crushed, and composited.  A total of 87 flotation tests were completed to investigate the impact of collector type and dosage, depressant type and dosage, pulp temperature, pulp density, pulp pH, and flotation feed size.

Bulk flotation and other operations continue at SGS in order to prepare concentrate samples for continuing hydrometallurgical test work and planned hydrometallurgical pilot plant testing.

Feed samples were analyzed by Inductively coupled plasma mass spectrometry (ICP-MS) and flotation products were analyzed by SGS using wavelength dispersive X-ray fluorescence (WD-XRF) following lithium borate fusion of the sample. The SGS analyses included a quality assurance / quality control (QA/QC) program including the insertion of rare earth element standard and blank samples.

Defense Metals detected no significant QA/QC issues during review of the data.  Defense Metals is not aware of any sampling, recovery or other factors that could materially affect the accuracy or reliability of the data referred to herein. SGS Lakefield is an ISO/IEC 17025 and ISO9001:2015 accredited laboratory. SGS is independent of Defense Metals Corp.

Qualified Person

The scientific and technical information contained in this news release, as it relates to the Wicheeda Rare Earth Element Project, has been reviewed and approved by John Goode, P. Eng., who is a Qualified Person as defined by National Instrument 43-101 and has provided the technical information relating to metallurgy in this news release.  Kristopher J. Raffle, P.Geo. (BC), a director of the Company, is the Qualified Person as defined in National Instrument 43-101 for the information relating to resources in this news release.

About the Wicheeda REE Project

Defense Metals 100% owned, 4,262-hectare (~10,532-acre) Wicheeda REE property is located approximately 80 km northeast of the city of Prince George, British Columbia; population 77,000. The Wicheeda REE Project is readily accessible by all-weather gravel roads and is near infrastructure, including hydro power transmission lines and gas pipelines. The nearby Canadian National Railway and major highways allow easy access to the port facilities at Prince Rupert, the closest major North American port to Asia.

The 2021 Wicheeda REE Project Preliminary Economic Assessment technical report (“PEA”) outlined a robust after-tax net present value (NPV@8%) of $517 million and an 18% IRR1. This PEA contemplated an open pit mining operation with a 1.75:1 (waste:mill feed) strip ratio providing a 1.8 Mtpa (“million tonnes per year”) mill throughput producing an average of 25,423 tonnes REO annually over a 16 year mine life. A Phase 1 initial pit strip ratio of 0.63:1 (waste:mill feed) would yield rapid access to higher grade surface mineralization in year 1 and payback of $440 million initial capital within 5 years.

About Defense Metals Corp.

Defense Metals Corp. is a company focused on the development of its 100% owned Wicheeda Rare Earth Element mineral deposit, located near Prince George, British Columbia, Canada, that contains metals and elements commonly used in in green energy, aerospace, automotive and defense technologies. Rare earth elements are especially important in the production of magnets used in wind turbines and in permanent magnet motors for electric vehicles. Defense Metals Corp. trades in Canada under the symbol “DEFN” on the TSX Venture Exchange, in the United States, under “DFMTF” on the OTCQB and in Germany on the Frankfurt Exchange under “35D”.

For further information, please contact:

Todd Hanas, Bluesky Corporate Communications Ltd.
Vice President, Investor Relations
Tel: (778) 994 8072
Email: todd@blueskycorp.ca

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Statement Regarding “Forward-Looking” Information

This news release contains “forward–looking information or statements” within the meaning of applicable securities laws, which may include, without limitation, statements relating to advancing the Wicheeda REE Project, the continuing hydrometallurgical test work and planned hydrometallurgical pilot plant testing, completing the planned PFS, the Company’s plans for its Wicheeda REE Project, the expected results and outcomes, the technical, financial and business prospects of the Company, its project and other matters. All statements in this news release, other than statements of historical facts, that address events or developments that the Company expects to occur, are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment in which the Company will operate in the future, including the price of rare earth elements, the anticipated costs and expenditures, the ability to achieve its goals, that general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed and on reasonable terms. Such forward-looking information reflects the Company’s views with respect to future events and is subject to risks, uncertainties and assumptions, including the risks and uncertainties relating to the interpretation of exploration and metallurgy results, risks related to the inherent uncertainty of exploration and cost estimates, the potential for unexpected costs and expenses and those other risks filed under the Company’s profile on SEDAR at www.sedar.com. While such estimates and assumptions are considered reasonable by the management of the Company, they are inherently subject to significant business, economic, competitive and regulatory uncertainties and risks. Factors that could cause actual results to differ materially from those in forward looking statements include, but are not limited to, continued availability of capital and financing and general economic, market or business conditions, adverse weather and climate conditions, failure to maintain or obtain all necessary government permits, approvals and authorizations, failure to maintain community acceptance (including First Nations),  risks relating to unanticipated operational difficulties (including failure of equipment or processes to operate in accordance with specifications or expectations, cost escalation, unavailability of personnel, materials and equipment, government action or delays in the receipt of government approvals, industrial disturbances or other job action, and unanticipated events related to health, safety and environmental matters), risks relating to inaccurate geological, metallurgical and engineering assumptions, decrease in the price of rare earth elements, the impact of Covid-19 or other viruses and diseases on the Company’s ability to operate, an inability to predict and counteract the effects of COVID-19 on the business of the Company, including but not limited to, the effects of COVID-19 on the price of commodities, capital market conditions, restriction on labour and international travel and supply chains, loss of key employees, consultants, or directors, increase in costs, delayed drilling results, litigation, and failure of counterparties to perform their contractual obligations. The Company does not undertake to update forward–looking statements or forward–looking information, except as required by law.

SOURCE Defense Metals Corp.

Century Lithium Corp. (CYDVF) – A Watershed Moment?


Monday, February 13, 2023

Mark Reichman, Senior Research Analyst, Natural Resources, Noble Capital Markets, Inc.

Refer to the full report for the price target, fundamental analysis, and rating.

Collaboration with Koch. Century Lithium is collaborating with Koch Technology Solutions (KTS) in the application of its proprietary Li-Pro direct lithium extraction process (DLE) at Century’s lithium extraction facility in Nevada.

Li-Pro technology. Koch purchased exclusive rights to theLionex DLE technology, for which Century had licensed, and integrated it into their Li-Pro process. The companies have executed an agreement to test KTS equipment and evaluate features of the Li-Pro process at Century’s pilot plant. While the program is independent from the company’s ongoing feasibility study, KTS will provide an engineering design along with costs for deployment of the DLE portion of the processing plant.


Get the Full Report

Equity Research is available at no cost to Registered users of Channelchek. Not a Member? Click ‘Join’ to join the Channelchek Community. There is no cost to register, and we never collect credit card information.

This Company Sponsored Research is provided by Noble Capital Markets, Inc., a FINRA and S.E.C. registered broker-dealer (B/D).

*Analyst certification and important disclosures included in the full report. NOTE: investment decisions should not be based upon the content of this research summary. Proper due diligence is required before making any investment decision. 

Release – Century Lithium and Koch Technology Solutions Collaborate on Li-Pro™ Process for Commercial Direct Lithium Extraction

Research News and Market Data on CYDVF

February 9, 2023 – Vancouver, Canada – Century Lithium Corp. (TSXV: LCE) (OTCQX: CYDVF) (Frankfurt: C1Z) (“Century Lithium”) is pleased to announce its collaboration with Koch Technology Solutions (“KTS”), a Koch Engineered Solutions (“KES”) company, in the application of the Li-Pro™ process for direct lithium extraction (“DLE”) at Century Lithium’s Lithium Extraction Facility (“Pilot Plant”) in Amargosa Valley, Nevada, USA.

“Century Lithium’s collaboration with KTS and KES has been productive, and we look forward to working together as we broaden our relationship,” said Bill Willoughby, President & CEO of Century Lithium. “Our DLE process in the Pilot Plant is performing very well and we are excited to work with Koch as we advance the Project.”

In March 2022, Century Lithium purchased a license to the Lionex DLE process (“Lionex”) and KTS subsequently acquired exclusive rights to the Lionex technology, which has been integrated into KTS’ Li-Pro™ process. Through an agreement completed February 6, 2023, the companies will work together to evaluate the added features of the Li-Pro™ process at Century Lithium’s Pilot Plant. With the information obtained, KTS will provide engineering for a full-scale deployment of the Li-Pro™ process for Century Lithium’s Clayton Valley Lithium Project (“Project”) located in Esmeralda County, in west-central Nevada.
 

“Century Lithium has done a great job identifying and validating a world-class lithium resource,” said Adam Sackett, President of Koch Technology Solutions. “As the energy transformation accelerates, we are excited to collaborate with them on the path to commercializing Li-Pro™ technology with our expanding set of complementary capabilities.”

As part of the program, certain key components of the Li-Pro™ process will be tested at Century Lithium’s Pilot Plant. KTS will also provide engineering design and costs for the full-scale DLE portion of the processing plant for Century Lithium’s Project. This program is independent from the Project’s ongoing Feasibility Study and will begin upon delivery of KTS equipment to the Pilot Plant. Century Lithium will fund the study, installation, and operation of the equipment at the Pilot Plant, and KTS will provide training and technical support.

About Koch Technology Solutions

Koch Technology Solutions (KTS) is the technology licensing business of Koch Engineered Solutions (KES). KTS creates value for its customers across a growing portfolio of technologies including direct lithium extraction, the polyester value chain, refining industry and 1,4-Butanediol plus its derivatives. KTS combines its exclusive technologies, expertise, and capabilities with those of other KES companies to provide overall solutions to optimize customers’ capital investments and existing manufacturing assets.

About Century Lithium Corp.

Century Lithium Corp. is a Canadian based advanced stage lithium company, focused on developing its 100%-owned Clayton Valley Lithium Project in west-central Nevada, USA. Century Lithium is currently in the pilot stage of testing on material from its lithium-bearing claystone deposit at its Lithium Extraction Facility in Amargosa Valley, Nevada and progressing towards completing a Feasibility Study and permitting, with the goal of becoming a domestic producer of lithium for the growing electric vehicle and battery storage market.

ON BEHALF OF CENTURY LITHIUM CORP.
WILLIAM WILLOUGHBY, PhD., PE
President & Chief Executive Officer

For further information, please contact:
Spiros Cacos | Vice President, Investor Relations
Direct: +1 604 764 1851
Toll Free: 1 800 567 8181
scacos@centurylithium.com
centurylithium.com  

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

Cautionary Note Regarding Forward-Looking Statements

This release includes certain statements that may be deemed to be “forward-looking statements”. Forward-looking statements are subject to risks, uncertainties and assumptions and are identified by words such as expects,” “estimates,” “projects,” “anticipates,” “believes,” “could,” “scheduled,” and other similar words. All statements in this release, other than statements of historical facts, that address events or developments that management of the Company expects, are forward-looking statements. Although management believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results or developments may differ materially from those in the forward-looking statements. The Company undertakes no obligation to update these forward-looking statements if management’s beliefs, estimates or opinions, or other factors, should change. Factors that could cause actual results to differ materially from those in forward-looking statements, include market prices, exploration, and development successes, continued availability of capital and financing, and general economic, market or business conditions. Please see the public filings of the Company at www.sedar.com for further information.

Release – Maple Gold Appoints Paul Harbidge to Its Technical Committee and Provides Deep Drilling Update

Research News and Market Data on MGMLF

 

Vancouver, British Columbia–(Newsfile Corp. – February 7, 2023) – Maple Gold Mines Ltd. (TSXV: MGM) (OTCQB: MGMLF) (FSE: M3G) (“Maple Gold” or the “Company“) is pleased to announce the appointment of Paul Harbidge to its technical committee (the “Technical Committee”), which helps guide exploration, drilling and project management at the Company’s projects located in Québec, Canada, and to provide an update on the ongoing deep drilling programs at the Douay Gold Project (“Douay”) and the Joutel Gold Project (“Joutel”), which are held by a 50/50 joint venture (“JV”) between the Company and Agnico Eagle Mines Limited.

Mr. Harbidge is an accomplished geologist with more than 25 years of experience and a track record of discovering world-class gold deposits. He is currently President, Chief Executive Officer and a Director of Faraday Copper Corp., an emerging U.S. copper developer. Mr. Harbidge was previously President and Chief Executive Officer of GT Gold Corp. and led the company to a C$456 million acquisition by Newmont Mining Corp. in May 2021. Prior to that, Mr. Harbidge was Senior Vice President of Exploration for Goldcorp Inc. from 2016 until its acquisition by Newmont Mining Corp. in April 2019. He also led the exploration team at Randgold Resources Limited that was credited with five major gold discoveries. Mr. Harbidge holds a First-Class Honours Degree in Geology from Kingston University, London (UK) and a Master of Science in Mineral Exploration and Mining Geology from Leicester University (UK).

“We are thrilled to have Paul Harbidge join our Technical Committee, as his experience successfully leading teams to multiple world-class gold discoveries further strengthens our technical group during this critical phase of growth for the Company,” stated Matthew Hornor, CEO of Maple Gold. “2023 is shaping up to be an exciting year for the JV as we approach completion of the first phase (~6,000 m) of deep drilling at Joutel and with the planned deep drilling campaign (~10,000 m) at Douay testing beneath the known 6 x 2 km resource footprint already well underway.”

A total of six (6) drill holes and drillhole extensions are planned at Douay, several of which are expected to be drilled to 2,000 metres (“m”) downhole or more. Deep drilling will test beneath the current mineral resource (SLR 2022) and across the favorable Casa Berardi North Fault corridor, where modeled wireframes demonstrate the potential for higher-grade (>2 grams per tonne (“g/t”) gold (“Au”)) mineralization at greater depths.

Deep drilling at Douay commenced in early January 2023 with drill hole DO-23-331, which is collared approximately 400 m southwest of the conceptual pit limits at the 531 Zone (see Figure 1). Previous drilling at the 531 Zone has returned some of the highest-grade and largest gold accumulations (grade x thickness) to-date at Douay, including 8.8 g/t Au over 28.5 m at a depth of 295.0 m in drill hole DO-21-310 (see news from September 9, 2021). While the primary target for this hole is located approximately 1,900 m downhole, where it is expected to intersect the projection of the defined mineralized zone at the 531 Zone significantly down-plunge, DO-23-331 will also serve to test the full width of the mineralized corridor in this area (see Figure 2). DO-23-331 is currently approaching 1,100 m downhole and is proving to be more mineralized than anticipated in the hanging wall rocks (see drill core images with preliminary observations in Plate 1).

Two (2) additional drill rigs were recently mobilized to Douay and as previously reported the Company expects five (5) rigs to be turning concurrently throughout Q1/2023.

“We are encouraged and cautiously optimistic after observing significant pyrite mineralization in the upper portion of the first deep drill hole in an area well south of the 531 Zone with very limited drilling,” stated Fred Speidel, VP Exploration of Maple Gold. “These initial observations point to the potential for these deep drill holes to intersect new mineralized horizons enroute to the targeted depths.”

Figure 1: Plan view showing locations of DO-23-331 and DO-23-332 (both in progress) with line of section for DO-23-331.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/3077/153909_b0ba8207d42d99db_001full.jpg


Figure 2: Cross section (300 m total width) looking WNW showing DO-23-331 drill hole trace with position of Casa Berardi North Fault (CBNF) and primary target corridor at depth.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/3077/153909_b0ba8207d42d99db_002full.jpg


Plate 1: DO-23-331 drill core with fenitized (biotite-calcite-altered) and pyritized basalt at 324 m downhole.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/3077/153909_b0ba8207d42d99db_003full.jpg

Assays for the entire deep drilling program (Douay and Joutel) are pending and results will be released on a periodic basis over the coming months once they are received and interpreted.

Option Issuance

The Company has approved the grant to certain consultants of stock options (“Options”) to purchase an aggregate of 200,000 common shares of the Company at an exercise price of $0.26 per common share. The Options have a 5-year term and vest 1/3 immediately, 1/3 in 12 months and 1/3 in 24 months from the date of grant until fully vested.

Qualified Person

The scientific and technical data contained in this press release was reviewed and prepared under the supervision of Fred Speidel, M. Sc., P. Geo., Vice-President Exploration of Maple Gold. Mr. Speidel is a Qualified Person under National Instrument 43-101 Standards of Disclosure for Mineral Projects. Mr. Speidel has verified the data related to the exploration information disclosed in this press release through his direct participation in the work.

About Maple Gold

Maple Gold Mines Ltd. is a Canadian advanced exploration company in a 50/50 joint venture with Agnico Eagle Mines Limited to jointly advance the district-scale Douay and Joutel gold projects located in Québec’s prolific Abitibi Greenstone Gold Belt. The projects benefit from exceptional infrastructure access and boast ~400 km2 of highly prospective ground including an established gold resource at Douay (SLR 2022) that holds significant expansion potential as well as the past-producing Eagle, Telbel and Eagle West mines at Joutel. In addition, the Company holds an exclusive option to acquire 100% of the Eagle Mine Property.

The district-scale property package also hosts a significant number of regional exploration targets along a 55 km strike length of the Casa Berardi Deformation Zone that have yet to be tested through drilling, making the project ripe for new gold and polymetallic discoveries. The Company is well capitalized and is currently focused on carrying out exploration and drill programs to grow resources and make new discoveries to establish an exciting new gold district in the heart of the Abitibi. For more information, please visit www.maplegoldmines.com.

ON BEHALF OF MAPLE GOLD MINES LTD.

“Matthew Hornor”

B. Matthew Hornor, President & CEO

For Further Information Please Contact:

Mr. Joness Lang
Executive Vice-President
Cell: 778.686.6836
Email: jlang@maplegoldmines.com

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS PRESS RELEASE.

Forward Looking Statements:

This press release contains “forward-looking information” and “forward-looking statements” (collectively referred to as “forward-looking statements”) within the meaning of applicable Canadian securities legislation in Canada, including statements about exploration work and results from current and future work programs. Forward-looking statements are based on assumptions, uncertainties and management’s best estimate of future events. Actual events or results could differ materially from the Company’s expectations and projections. Investors are cautioned that forward-looking statements involve risks and uncertainties. Accordingly, readers should not place undue reliance on forward-looking statements. For a more detailed discussion of such risks and other factors that could cause actual results to differ materially from those expressed or implied by such forward-looking statements, refer to Maple Gold Mines Ltd.’s filings with Canadian securities regulators available on www.sedar.com or the Company’s website at www.maplegoldmines.comThe Company does not intend, and expressly disclaims any intention or obligation to, update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/153909

Maple Gold Mines (MGMLF) – Will 2023 Be the Year that Maple Gold Goes Viral?


Wednesday, February 08, 2023

Mark Reichman, Senior Research Analyst, Natural Resources, Noble Capital Markets, Inc.

Refer to the full report for the price target, fundamental analysis, and rating.

Deep drilling program at Douay. A 10,000-meter drill program is underway at the Douay project, a joint venture with Agnico Eagle. Two additional drill rigs were mobilized at Douay and the company expects progress to accelerate with five rigs turning throughout the first quarter of 2023. A total of six drill holes are planned, several of which are expected to be drilled to at least 2,000 meters downhole. Mines in the Abitibi gold belt are known for vertical continuity and higher grades at depth. Deep drilling will test beneath the current mineral resource and across the Casa Berardi North Fault corridor.

Nearing the target. In January, deep drilling at Douay commenced with Hole DO-23-331, collared approximately 400 meters southwest of the conceptual pit limits at the 531 Zone, currently approaching 1,100 meters downhole. Previous drilling at the 531 Zone returned some of the highest-grade and largest accumulations of gold at Douay based on grade and thickness. The primary target is roughly 1,900 meters downhole where it is expected to intersect the projection of the defined mineralized zone at the 531 Zone significantly down plunge. Hole DO-23-331 will also test the width of the mineralized corridor in this area.


Get the Full Report

Equity Research is available at no cost to Registered users of Channelchek. Not a Member? Click ‘Join’ to join the Channelchek Community. There is no cost to register, and we never collect credit card information.

This Company Sponsored Research is provided by Noble Capital Markets, Inc., a FINRA and S.E.C. registered broker-dealer (B/D).

*Analyst certification and important disclosures included in the full report. NOTE: investment decisions should not be based upon the content of this research summary. Proper due diligence is required before making any investment decision. 

Release – Defense Metals Engages SRK to Start Pre-Feasibility Level Site Geotechnical Investigations & Appoints Project Development Coordinator for Wicheeda Rare Earth Element Project

Research News and Market Data on DFMTF

VANCOUVER, BC, Feb. 7, 2023 /PRNewswire/ – Defense Metals Corp. (“Defense Metals” or the “Company“; (TSXV: DEFN) (OTCQB: DFMTF) (FSE: 35D) is pleased to announce it has engaged SRK Consulting (Canada) Inc. (“SRK”) to commence site geotechnical investigations at its wholly owned Wicheeda Rare Earth Element (REE) Project during 2023. The Company is also pleased to announce the appointment of Mr. Kevin Weston as Wicheeda REE Project Development Coordinator.

Craig Taylor, CEO, and Director of Defense Metals stated:

“We are excited to start this new phase of development for our Wicheeda Rare Earth Project. Defense Metals is pleased to continue its relationship with SRK given their prior involvement in our positive PEA and recently completed pit slope geotechnical study. Given the rapid pace of project development, we are also very pleased to announce the appointment of Mr. Kevin Weston as Project Development Coordinator. We look forward to Kevin focusing his more than 40 years experience in mine permitting, operations, and project management on the continued development of Wicheeda; one of the best rare earth projects globally.”

SRK Geotechnical Study Details

The SRK geotechnical studies will inform the planned Wicheeda REE Project preliminary feasibility study (“PFS”) with respect to areas of geotechnical engineering, hydrology, site infrastructure, tailings facilities, geochemistry, and site water management. SRK’s work will include field investigations, including preliminary characterization of shallow soil subsurface and bedrock foundations, tasks designed to advance the PFS engineering work including preliminary characterization of shallow soil subsurface and bedrock foundations.

The work will facilitate the development of PFS level design criteria, including siting evaluation, and alternative trade-off studies focusing on technical, environmental, permitting risk and socio-economic considerations to support community and stake-holder engagement. As part of the alternatives assessment a study of surficial geology and geomorphology to identify potential geohazards, and identify potential borrow pit areas both for tailings storage facility (“TSF”) construction materials and as suitable reclamation material for mine closure is planned. In addition, rock geochemical characterization to support mine planning/waste management and to develop preliminary water chemistry predictions will be completed.

Appointment of Project Development Coordinator

Defense Metals is pleased to announce the appointment of Mr. Kevin Weston as Wicheeda REE Project Development Coordinator. Kevin Weston is a graduate of McGill University’s mining engineering program with more than 40 years of experience in mine permitting, operations, and project management. Kevin is a proven safety/environmental leader and community relations builder.

Significantly, Mr. Weston brings a wealth of prior British Columbia project development experience having been COO of JDS Silver Inc. when, between 2013 and 2017, he oversaw the engineering, successful mine permitting, and ultimately construction of the Silvertip silver-lead-zinc mine in northern British Columbia.

Mr. Weston will be instrumental in coordinating the technical, geological, engineering, environmental, socio-economic and First Nations engagement aspects of the Wicheeda REE Project in support of future project development permit applications.

Future permitting of the Wicheeda REE Project is expected to proceed through the B.C. Ministry of Energy, Mines, and Low Carbon Innovation Major Mine Permitting Office (“MMPO”) and environmental assessment (“EA”) via the BC Environmental Assessment Office (“EAO”) as required by British Columbia’s Environmental Assessment Act. B.C. has a rigorous EA process that carefully evaluates the potential environmental, economic, social, heritage and health impacts of proposed projects, as well as potential impacts to First Nations interests.

About the Wicheeda Rare Earth Element Property

Defense Metals 100% owned, 4,262-hectare (~10,532-acre) Wicheeda REE Property is located approximately 80 km northeast of the city of Prince George, British Columbia; population 77,000. The Wicheeda project is readily accessible by all-weather gravel roads and is near infrastructure, including hydro power transmission lines, gas pipelines, The nearby Canadian National Railway and major highways allow easy access to the port facilities at Prince Rupert, the closest major North American port to Asia.

The 2021 Wicheeda REE Project Preliminary Economic Assessment technical report (“PEA”) outlined a robust after-tax net present value (NPV@8%) of $517 million and an 18% IRR1. This PEA contemplated an open pit mining operation with a 1.75:1 (waste:mill feed) strip ratio providing a 1.8 Mtpa (“million tonnes per year”) mill throughput  producing an average of 25,423 tonnes REO annually over a 16 year mine life. A Phase 1 initial pit strip ratio of 0.63:1 (waste:mill feed) would yield rapid access to higher grade surface mineralization in year 1 and payback of $440 million initial capital within 5 years.

Defense Metals and the McLeod Lake Indian Band have entered into a Mineral Exploration Agreement that establishes a framework for communication and cooperation going forward and provides current economic opportunities for the community. In addition, the agreement provides a roadmap to building a long-term and mutually beneficial relationship as the exploration activities advance.

1 Independent Preliminary Economic Assessment for the Wicheeda Rare Earth Element Project, British Columbia, Canada, dated January 6, 2022, with an effective date of November 7, 2021, and prepared by SRK Consulting (Canada) Inc. is filed under Defense Metals Corp.’s Issuer Profile on SEDAR (www.sedar.com).


Qualified Person

The scientific and technical information contained in this news release as it relates to the Wicheeda REE Project has been reviewed and approved by Kristopher J. Raffle, P.Geo. (B.C.), Principal and Consultant of APEX Geoscience Ltd. of Edmonton, Alberta, who is a director of Defense Metals and a “Qualified Person” (“QP”) as defined in NI 43-101. Mr. Raffle has verified the data, which included a review of the sampling, analytical and test methods underlying the data, information and opinions disclosed herein.

About Defense Metals Corp.

Defense Metals Corp. is a company focused on the development of its 100% owned Wicheeda Rare Earth Element mineral deposit, located near Prince George, British Columbia, Canada, that contains metals and elements commonly used in in green energy, aerospace, automotive and defense technologies. Rare earth elements are especially important in the production of magnets used in wind turbines and in permanent magnet motors for electric vehicles.  Defense Metals Corp. trades in Canada under the symbol “DEFN” on the TSX Venture Exchange, in the United States, under “DFMTF” on the OTCQB and in Germany on the Frankfurt Exchange under “35D”.

For further information, please contact: 
Todd Hanas, Bluesky Corporate Communications Ltd.
Vice President, Investor Relations
Tel: (778) 994 8072
Email: todd@blueskycorp.ca

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Statement Regarding “Forward-Looking” Information

This news release contains “forward–looking information or statements” within the meaning of applicable securities laws, which may include, without limitation, statements relating to advancing the Wicheeda REE Project, the completion of the site geotechnical investigations by SRK, the Company’s plans for its Wicheeda REE Project, making permit applications, expected results and outcomes, plans to complete a PFS, the technical, financial and business prospects of the Company, its project and other matters. All statements in this news release, other than statements of historical facts, that address events or developments that the Company expects to occur, are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment in which the Company will operate in the future, including the price of rare earth elements, the anticipated costs and expenditures, the ability to achieve its goals, that general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed and on reasonable terms. Such forward-looking information reflects the Company’s views with respect to future events and is subject to risks, uncertainties and assumptions, including the risks and uncertainties relating to the interpretation of exploration results, risks related to the inherent uncertainty of exploration and cost estimates, the potential for unexpected costs and expenses and those other risks filed under the Company’s profile on SEDAR at www.sedar.com. While such estimates and assumptions are considered reasonable by the management of the Company, they are inherently subject to significant business, economic, competitive and regulatory uncertainties and risks. Factors that could cause actual results to differ materially from those in forward looking statements include, but are not limited to, continued availability of capital and financing and general economic, market or business conditions, adverse weather and climate conditions, failure to maintain or obtain all necessary government permits, approvals and authorizations, failure to maintain community acceptance (including First Nations),  risks relating to unanticipated operational difficulties (including failure of equipment or processes to operate in accordance with specifications or expectations, cost escalation, unavailability of personnel, materials and equipment, government action or delays in the receipt of government approvals, industrial disturbances or other job action, and unanticipated events related to health, safety and environmental matters), risks relating to inaccurate geological and engineering assumptions, decrease in the price of rare earth elements, the impact of Covid-19 or other viruses and diseases on the Company’s ability to operate, an inability to predict and counteract the effects of COVID-19 on the business of the Company, including but not limited to, the effects of COVID-19 on the price of commodities, capital market conditions, restriction on labour and international travel and supply chains, loss of key employees, consultants, or directors, increase in costs, delayed drilling results, litigation, and failure of counterparties to perform their contractual obligations. The Company does not undertake to update forward–looking statements or forward–looking information, except as required by law.

Cision

View original content to download multimedia:https://www.prnewswire.com/news-releases/defense-metals-engages-srk-to-start-pre-feasibility-level-site-geotechnical-investigations–appoints-project-development-coordinator-for-wicheeda-rare-earth-element-project-301740739.html

SOURCE Defense Metals Corp.