Wednesday, April 26, 2023
Mark Reichman, Managing Director, Equity Research Analyst, Natural Resources, Noble Capital Markets, Inc.
Refer to the full report for the price target, fundamental analysis, and rating.
Feasibility study expected by mid-year. The Clayton Valley feasibility study is advancing and expected to be released mid-2023. The main categories of work outstanding are: 1) project execution plan and schedule, 2) draft estimates, 3) draft report, 4) final capital and operating cost estimates, 5) final engineering report, and 6) final technical report. The feasibility study is being led by Wood PLC, supported by Global Resource Engineering for the mining component, thyssenKrupp Nucera AG & Co. for the design of the chlor-alkali plant, and Saltworks for the extraction process.
Collaboration with Koch. Apart from the feasibility study, Century Lithium is collaborating with Koch Technology Solutions (KTS) in the application of its proprietary Li-Pro direct lithium extraction (DLE) process. Koch Engineered Solutions, the owners of the Lionex direct lithium extraction technology, will provide the engineering design and costs for the full-scale DLE portion of the processing plant for the Clayton Valley Project.
Get the Full Report
Equity Research is available at no cost to Registered users of Channelchek. Not a Member? Click ‘Join’ to join the Channelchek Community. There is no cost to register, and we never collect credit card information.
This Company Sponsored Research is provided by Noble Capital Markets, Inc., a FINRA and S.E.C. registered broker-dealer (B/D).
*Analyst certification and important disclosures included in the full report. NOTE: investment decisions should not be based upon the content of this research summary. Proper due diligence is required before making any investment decision.